Advertisement dated September 25, 2026: Advertisement for the position(s) of Junior Research Fellow (JRF) in Dept. of Electrical Engg. (Last date to apply: October 30, 2026 by 05:00 PM)
Official Source
Quick answer
Indian Institute of Technology Roorkee has released the Advertisement dated September 25, 2026 notification. Apply only through the official website (iitr.ac.in).
Get updates like this first, free:Join on WhatsApp Join on Telegram
Notice details
| Name of post | Advertisement dated September 25, 2026: Advertisement for the position(s) of Junior Research Fellow (JRF) in Dept. of Electrical Engg. (Last date to apply: October 30, 2026 by 05:00 PM) |
|---|---|
| Organisation | Indian Institute of Technology Roorkee |
| Job location | All India |
| Qualification | Requirement of M.E./lvI. Tech. @lcctrical Engineerin/Power System and squivalerl branches), B.'fech./8.[. with valid Gate score. (Desirable l]ackground: Kmw'ledy of Power System Frotection. Conccprs oJ Microgrkl and Integrathn of DER) 5. fmoluments: Rs. 40,lXXll- finit Two Yeani… |
| Posted on | 19 Oct 2026 |
Read from the official notice. Always confirm dates, fees and eligibility on the official website.
From the official notice
Page l1 Applicarions are invite.l Jiom lruliun natkntuls only.lirr projcL'l lrosition(s) as per the details given helow ./ir the rcseorch prtlecr uneler tht: I'rinciryl im,estigabr, Prof. Manoj Tripothy. Deryrtmcnl of Electrirul Engineering, lruliun Instituta of Technoktg,: Rotrkee. L Title of project: Adaptivc Protection of Distribution Nctwork Systems with DER lntegration 2- Sponsor ofthe project: GE Renewablc Energt Technologies Privete Ltd., India 3. Prujcct pcsition(s) and numbcr: JRf (01) 4. Qualifications: Requirement of M.E./lvI. Tech. @lcctrical Engineerin/Power System and squivalerl branches), B.'fech./8.[. with valid Gate score. (Desirable l]ackground: Kmw'ledy of Power System Frotection. Conccprs oJ Microgrkl and Integrathn of DER) 5. fmoluments: Rs. 40,lXXll- finit Two Yeani and Rs. 45,000/- Nexl Two Y ears. (Consolidated) 6. Duration: tl4 Yearn or till the end of project (whichever is earlier) :. Job description: Stuiy an<] Set up aJ Smart Distribution Nelwork. Luborotory harduorc. inclading ,arious lypes of DER.
Important Links
| Download Official Notice (PDF) | |
|---|---|
| Official Website | Click Here iitr.ac.in |