ICF Consultant/PU/ICF Recruitment 2026 – Apply Offline
Official Source Verified
Not open to the public: Retired employees only. Check the eligibility in the official notification before applying.
Quick answer
Integral Coach Factory has released the ICF Consultant/PU/ICF Recruitment 2026 notification. The last date to apply is 07 December 2026. Who can apply: retired employees only; this recruitment is not open to the public. Apply only through the official website (icf.indianrailways.gov.in).
Last checked: 17 Nov 2026, 11:50 pm
Get updates like this first, free:Join on WhatsApp Join on Telegram

A new recruitment from Integral Coach Factory is out, with vacancies under advertisement no. No.PB/GG/Re-Engagement/Vol.I dated 17/11/2026. The last date to apply is 07 December 2026. Selection is by the suitability/competency of the retired officer will be judged on the basis of the last five apars, as per established norms for a dpc, by a three-member committee of phods/chods appointed by the general manager. while re-engaging the officer, medical fitness in the appropriate category will be obtained from the designated authorities as per existing practices.
On this page
- ICF Consultant/PU/ICF Recruitment 2026: overview
- Important dates
- Age limit
- About ICF Recruitment 2026
- Where and How to Send
- Posts, Eligibility and Pay
- ICF Recruitment 2026 Job Description
- Maintenance activities (as per Indian Railway Works Manual)
- Construction activities
- Reporting and powers
- Enclosures
- Important Instructions
- Salary
- Selection process
ICF Consultant/PU/ICF Recruitment 2026: overview
- The official notification does not specify the application fee or a minimum educational qualification.
| Particulars | Details |
|---|---|
| Organisation | Integral Coach Factory, Indian Railways (Office of the PCPO) |
| Advertisement No. | No.PB/GG/Re-Engagement/Vol.I dated 17/11/2026 |
| Post(s) | Consultant (Engg.)/PU/ICF |
| Vacancies | 1 (Group-B, Civil) |
| Pay | Fixed Monthly Remuneration: pay drawn at the time of retirement minus Basic Pension |
| Qualification | Railway Officers retired from Group-B (Level-8 & Level-9) in the Civil Engineering Department |
| Age Limit | Maximum 65 years |
| Job Location | Civil Engineering Department, Integral Coach Factory, Chennai |
| Apply By | Post, or by hand at Receipt Section of Personnel Branch/ICF |
| Last Date | 07.12.2026 (Monday) at 17.30 Hrs (application must reach) |
Important dates
| Event | Date |
|---|---|
| Notification date | 17 November 2026 |
| Last date to apply | 07 December 2026 |
| Scheme valid / re-engagement up to | 31 December 2026 |
Age limit
- The maximum age limit for re-engagement is 65 years.
About ICF Recruitment 2026
Integral Coach Factory is a production unit of Indian Railways located in Chennai. This re-engagement is issued by the Office of the PCPO under Railway Board's letters No.2024/E(GR)I/38/I dated 29.08.2024 and 08.11.2024. The notice states that the scheme for re-engagement of retired Railway Gazetted Officers is valid only up to 31 December 2026, and the post is filled "in exigencies of the services".
Where and How to Send
- Use the prescribed Application/Proforma given at Annexure-D of the notification. All columns are mandatory, and officers must fill them in their own handwriting.
- Affix a recent passport size photograph in the space provided on the form.
- Sign legibly in the space provided.
- Enclose a copy of the PPO (7th CPC Pay Matrix).
- Superscribe the envelope: "APPLICATION FOR RE-ENGAGEMENT AS CONSULTANT (ENGG) / PU / ICF".
- Send it by post to the address above, or hand it in at the Receipt Section of Personnel Branch/ICF, so that it reaches Personnel Branch/ICF/Chennai-38 on or before 07.12.2026 at 17.30 Hrs.
- Send the filled application in the prescribed format by post to: Deputy Chief Personnel Officer, Shell Administrative Office, Integral Coach Factory, Chennai – 600 038. Applicants may also submit the application at the Receipt Section of Personnel Branch/ICF.
- The form asks for the applicant's name, father's name, designation on the day of retirement, date of promotion to Group-B, office from where retired, department, date of birth, age as on the date of notification, Employee No. and HRMS ID, date of appointment, date of retirement, community (SC/ST/OBC/UR), educational/professional qualification, last pay drawn and level, PPO number and date, Basic Pension sanctioned (without deducting commutation pension), permanent and correspondence addresses with PIN code, email ID and mobile number. The applicant also signs declarations on confidentiality, on immediate discharge, and on the truth of the information given.
- For enquiries, the notice gives these Railway landline numbers: Dy.CPO 044 - 261 47702 and Ch.OS / GAZ 044 - 261 47710.
Posts, Eligibility and Pay
- Eligibility: "Railway Officers, retired" in the Civil Engineering Department from Group-B (Level-8 & Level-9) are eligible to apply.
- Educational qualification: The official notification does not specify the minimum educational qualification; the form only asks applicants to state their educational/professional qualification.
- Age limit: Maximum age limit for re-engagement shall be 65 years.
- Medical fitness: Medical fitness in the appropriate category shall be assessed by designated authorities before re-engagement.
- Pay: A Fixed Monthly Remuneration, arrived at by deducting the Basic Pension from the pay drawn at the time of retirement. The amount stays unchanged for the term of the contract. Annual increment/percentage increase and Dearness Allowance shall NOT be allowed during the contract period. The example for determining remuneration is as given in DoE's OM No.F.No.3-25/2020-E.IIIA, dated 09.12.2020.
- Allowances: No HRA and no residential accommodation. Transport Allowance for commuting between residence and place of work is allowed, not exceeding the rate applicable at the time of retirement, and stays unchanged during the term. TA/DA on official tour, if any, may be allowed as per entitlement at the time of retirement.
- Leave: Paid leave of absence may be allowed at 1.5 days for each completed month of service. Leave cannot be accumulated beyond a calendar year or carried forward if the engagement is extended, and unutilised leave is not paid for at discharge or expiry of the contract.
- Candidates should check the official notification for the full eligibility conditions of the post.
| Department | Post | Vacancies |
|---|---|---|
| Civil | Consultant (Engg.)/PU/ICF | 1 Group-B |
ICF Recruitment 2026 Job Description
Under the Terms of Reference (Annexure-C), the officer will be designated Consultant (Engineering/Construction) or Senior Consultant (Engineering/Construction) and will look after all works connected with maintenance and construction. The work includes responsibilities of inspection, supervision, drawing, etc., excluding Financial and D&AR powers.
Maintenance activities (as per Indian Railway Works Manual)
- Inspection of all buildings & structures and their maintenance in a satisfactory and safe condition.
- Providing suggestion and recommendation for execution and maintenance of works.
- Verification of stores held by stock-holders.
- Inspection of Water Supply, and of the Sewerage and Drainage System, and their maintenance in a satisfactory and safe condition.
- Association with committees and groups such as the Colony Committee, the Sanitation Committee and the Station Improvement Group, with prompt action on items in his jurisdiction.
Construction activities
- Planning, preparation of plan, execution, measurements, test checking and commissioning of works entrusted to him.
Reporting and powers
- The Consultant (Engineering/Construction) will work under the Deputy Chief Engineer; the Senior Consultant (Engineering/Construction) will work under the Administrative Control of the Deputy Chief Engineer.
- No financial powers to pass bills; they can certify measurement and put up to the Deputy Chief Engineer.
- No D&AR powers; they can submit recommendations for D&AR actions to the Deputy Chief Engineer.
- Not authorised to issue safety certificates; they can recommend the issue to the Deputy Chief Engineer.
- Not to be made in-charge of a unit like Branch Officer in the Division; may recommend suggestions on financial and other matters to the regular officer.
Enclosures
- Filled and signed Application/Proforma (Annexure-D).
- Recent passport size photograph affixed on the application.
- Copy of PPO (7th CPC Pay Matrix).
Important Instructions
- An application will be treated as "Invalid / Ineligible" if it is unsigned, has no latest photograph affixed, is incomplete, or lacks the copies indicated in Annexure-D.
- The period of re-engagement shall be up to 31 December 2026; no retired officer should be engaged beyond that date.
- Re-engagement as Consultant shall not be considered re-employment, and services can be terminated at any time.
- The re-engaged officer will be discharged immediately on joining of selected candidate(s) from UPSC or through departmental selection, or for any other reasons of administrative convenience on the recommendation of the PHOD/CHOD concerned.
- The Consultant must not divulge information gathered during the assignment and shall sign an agreement of Confidentiality with Govt. of India containing a clause on Ethics and Integrity.
- The engagement is subject to all conditions in Railway Board letter No.2024/E(GR)I/38/I dated 29.08.2024 and later Railway Board instructions; in any dispute, the decision of the Chief Engineer is final and binding.
Salary
- The Consultant gets a Fixed Monthly Remuneration worked out by deducting the Basic Pension from the pay drawn at retirement
- it stays unchanged for the contract, with no annual increment, percentage increase or Dearness Allowance.
Selection process
- Stage 1
The suitability/competency of the retired officer will be judged on the basis of the last five APARs, as per established norms for a DPC, by a three-member committee of PHODs/CHODs appointed by the General Manager. While re-engaging the officer, medical fitness in the appropriate category will be obtained from the designated authorities as per existing practices.
Source: Integral Coach Factory official notice (icf.indianrailways.gov.in). If anything here differs from the official notice, the notice is correct. How we check facts
Important Links
| ICF Consultant Application Form (Annexure-D) | Click Here icf.indianrailways.gov.in |
|---|---|
| ICF Consultant (Engg.) Notification PDF | Download icf.indianrailways.gov.in |
| Integral Coach Factory Official Website | Click Here icf.indianrailways.gov.in |
| Link | Details |
| ICF Consultant Application Form (Annexure-D) | Prescribed proforma to be filled by hand |
| ICF Consultant (Engg.) Notification PDF | Notification No.PB/GG/Re-Engagement/Vol.I dated 17/11/2026 |
| Integral Coach Factory Official Website | Official website of ICF |